Billings West High School | OnSite Energy Bozeman | Bozeman MT Solar Power

Billings West High School

Projects
Client Profile
West High School, home to the Golden Bears, is one of the three public high schools in Billings and now the proud owner of a 50kW solar array on campus. OnSite Energy worked with the Billings Public Schools Director of Facilities to apply for NorthWestern Energy E+ Renewable Program grant funding for this project, which was awarded in 2019. After a slight construction delay as we all learned to safely navigate the COVID-19 pandemic, the array was completed over the summer of 2020 in time for students to show up in the fall and see firsthand how solar photovoltaic energy works. We really love doing projects on schools that can provide on site learning opportunities for the environmental, science and STEM curriculum, as well as reduce the school's operational costs. 
Billings West High School

School

2020
Billings, MT
REC 320 Modules
REC 320 Modules
Billings West High School

School

2020
Billings, MT
INSTALLED2020
POWER50 kW
PRODUCTIONEstimated 73,183 kWh/year
PANELSREC TP2M 320-watt Modules (144)
INVERTERSMA Sunny TriPower Core1 50kW
MOUNTSnapNrack Series 200 Ground Mount
WARRANTY25 Year Power Output Warranty, 20 Year Manufacturer Warranty

Client Profile

West High School, home to the Golden Bears, is one of the three public high schools in Billings and now the proud owner of a 50kW solar array on campus. OnSite Energy worked with the Billings Public Schools Director of Facilities to apply for NorthWestern Energy E+ Renewable Program grant funding for this project, which was awarded in 2019. After a slight construction delay as we all learned to safely navigate the COVID-19 pandemic, the array was completed over the summer of 2020 in time for students to show up in the fall and see firsthand how solar photovoltaic energy works. We really love doing projects on schools that can provide on site learning opportunities for the environmental, science and STEM curriculum, as well as reduce the school's operational costs. 

Construction

Want to see how it's done? Check out this time lapse video of the OnSite Energy crew installing the 50kW array!
Assembling the racking
Assembling the racking