Featured Commercial Projects
Commercial
54.75 kW array on the new Community Health Partners facility in BozemanCommercial
Bridger Bowl Ski Area, Bozeman's beloved local ski resort, installs a 50 kW solar array near the mid-mountain lodge.Commercial
65 kW of solar in downtown BozemanCommercial
Bridger Bowl Ski Area, Bozeman's beloved local ski resort, installs a 50 kW solar array near the mid-mountain lodge.Commercial
The Bozeman Food Co-op added a new 16.4 kW solar array to the roof when they expanded their W. Main St. facility.Commercial
In early spring of 2019 we installed a 22 kW solar array at Eagle Mount in Bozeman. The facility had a preexisting 5 kW solar array installed in 2012 that we adapted into the overall design of the now 27 kW system.Commercial
The Park County Senior Citizens Corporation and the Yellowstone Bend Citizen's Council worked together with OnSite Energy to install a 50 kW solar array on the roof of the Park County Senior Center in Livingston, MT.Commercial
The owners of Spark R&D have been planning a solar roof-top project since they bought their 12,000 square foot building in 2016, and last month we're excited to turn that long-term dream into a reality!Commercial
The combined power output of this 4-array solar system adds up to 50 kW, and will supply 100% of the electricity usage of this Bozeman commercial office building. We completed the installation in August, 2017.Commercial
In the summer of 2017 we completed this beautiful 50 kW solar installation on the roof of the Spire Climbing Center, an indoor climbing gym in Bozeman, MT. The energy production from the system is expected to supply nearly 30% of the center's annual energy usage!Commercial
Solar on the OnSite Energy shop/office roof! Our friends and neighbors at Autopilot commissioned a 18.24 kW solar system on the roof of our shared office building.Commercial
Larkspur Commons, a brand new 136-unit affordable housing development, was designed to be affordable, efficient, and innovative. Hosting the largest solar hot water system in the state of Montana, along with a smaller scale solar electric system, renewable energy is an important aspect of this landmark development project.Commercial
OnSite Energy was hired for grant procurement and design-build services for this highly-visible, state-of-the-art 30 kW solar installation.Business
On Site Management, Inc. (OSM) celebrated Independence Day this year with the installation of a new 50 kW solar electric system on their main shop building at their log yard in Belgrade, MTNon-Profit
Montana's first LEED Platinum certified building accomplishes 100% electrical energy offset with a new 24.75 kW solar carportGovernment
Installed in December of 2015 this 27.36 kW solar array is integrated to the roof at the newly-constructed Butte Justice Center.Business
Local market goes solar!National Park
Though not the largest solar system in Yellowstone, this is perhaps the most unique and high-profile given the intent behind the project’s LEED certification process, and given its high-visibility to visitors of one the Park’s busiest areas: Old Faithful.Non-Profit
This 30 kW solar system is one of the largest in Bozeman city limits, and covers the entire south-facing roof of the Emerson Center for the Arts and Culture's Crawford Theatre.Commercial
Completed in April of 2015, this 32.4 kW solar electric system is the installed on a historic building -located on the corner of Main Street and Tracy Ave- which is home to various small business offices and retail spaces.Non-Profit Organization
Together with the Shelter's operations director, OnSite Energy successfully procured grant funding for and installed a 10 kW solar electric system there- reducing the facility's operating costs and enabling the mission-driven organization to continue to succeed.Ranch
Completed in October of 2013, this 10 kW ground-mounted solar array is projected to offset 100% of the electrical usage at Hawks Ridge Ranch located in the Madison Valley, south of Ennis, MT.Agriculture
The energy produced by this 25 kW ground-mounted solar array will offset the electrical usage of three center pivot pumps located on the Pheasant Farms property just outside of Roundup, MT.Website design by JTech Communications